DONALD G. TOPPING REGIONAL HOPE CENTER

“All children deserve a safe and positive place where they are surrounded by adults that know and care about them.  If it is also a place where families can access services they need--everybody wins."

Tom Hosea
Chairman, Phase One Committee - Tacoma

Our old friend South End Boys & Girls Club is no longer up to the task of providing our children with the environment they need to grow into productive, responsible and caring citizens.

The building was dedicated in 1954. A pool was added in the early 60’s and some renovations were completed in the 80’s and 90’s. But all in all, the South End Club today is the same building that has served as a second home for thousands of kids for more than 50 years.

The Cost Of Renovation Outweighs The Cost of Construction.

The concrete gym floor is still tough on the feet. The flat roof leaks. The kitchen is still cramped. And the pool was closed years ago to reduce expenses.

On top of that, windows, doors and the heating system do not meet minimum energy standards. The ventilation system can not handle the load. The restrooms and locker rooms need top-to-bottom makeovers. The lighting system is ready for an upgrade. There is no fire sprinkler system. The playfield is not up to par and handicap access is lacking.

As difficult as it is to say goodbye to an old friend, it is time to replace the South End Boys & Girls Club.


A New Community Center in a Better Location

The current facility is surrounded by businesses, limiting the Club’s ability to grow.

As a solution, we are working with the Tacoma School District to develop a plan that will utilize the old Mt. Tahoma High School. The center will include the existing gyms and will be remodeled to meet our needs. The location couldn’t be better. It’s right in the middle of a growing community. Adjacent to Metro Parks SERA playfields. Close to public transportation and just 20 blocks from the current Club.

 
PROJECT COSTS

Direct Costs: $ 8,500,000
Building construction & renovation
Fixtures, furnishings & equipment
Architectural & engineering design
Project Manager
Contingency
Construction escalation costs
Sales tax on construction costs

All plans and data provided are subject to change
Program Enhancement (5 year): $ 2,600,000
New staff
New programs
Staff retention and development
Transportation


Endowment: $ 1,500,000


Total: $12,600,000
 

Back  

 

 

 

 

 

 

 

 

 

 

 

 

Projected Building Plan
Donald G. Topping Regional

HOPE Center
Building Plan Subject to Change